Treatment plant, Gigablok – Katowice

Wastewater treatment plant Katowice – Gigablok. Start of implementation 2004. Execution of excavations – 65,000m3, execution of embankments 85,000m3. General contractor Hydrobudowa-6 S.A.. Investor supervision – ILF Consulting Engineering.

LOCATION:
Katowice
BUILD DATE:
06-Apr-1999

Płock ring road – 3rd section

Implementation of earthworks, foundation for Porr Polska on the third section of the ring road in Plock.

LOCATION:
Płock
BUILD DATE:
15-Jul-2017

CNH – foundation for the hall and road system, land development

Implementation of earthworks for the newly built hall, parking lot and the entire road system. Stabilization of soil reinforcement with cement, Silment. Asphalt pavements on aggregate substructure.

LOCATION:
Płock
BUILD DATE:
05-Nov-2017

Installation of filtration of post-sodium lime for CIECH Soda Polska S.A.

Signed contract with Elektrobudowa S.A. for road and construction industry for the investment “Post-sodium lime filtration installation for CIECH Soda Polska S.A.”. The subject of the contract is the construction of road 1720, storage yard and other road infrastructure.

LOCATION:
Janikowo
BUILD DATE:
16-Dec-2015

Gas-Steam Block

Earthworks for the investment ‘Gas-Steam Block’.

LOCATION:
Płock
BUILD DATE:
30-Jul-2015

Leveling and demolition – site for office building and halls.

Demolition work of former Petrobudowa Plock concrete batching plant, leveling for future investment of office building and production hall.

LOCATION:
Płock ul. Zglenickiego
BUILD DATE:
11-Feb-2014

Construction of a collision-free intersection of Piłsudski Avenue and the railroad line

We performed earthworks, temporary traffic organization – temporary roads. Foundation piles for railroad overpass, earthworks – reconstruction of Pilsudski street. Road works – base course, structural layers of pavement, stabilization.

LOCATION:
Płock ul. Piłsudskiego
BUILD DATE:
10-Oct-2013

Construction of a rainwater treatment plant with a collective outlet to the Brzeźnica river

Construction of a technological road in the slope, macro leveling of the area for the drop tank.

LOCATION:
Płock ul. Polna
BUILD DATE:
10-Oct-2013

Ash Landfill – Power Plant

Execution of foundation for structural layers of concrete pavement – technological roads at the ash disposal site – Power Plant in Łęg.  Scope of work – supply of mineral aggregates, earthworks, profiling and compacting of the subgrade, stabilization of ashes with cement.

LOCATION:
Łęg
BUILD DATE:
01-Dec-2012

GRABÓWKA in Płock

Start of implementation on May 2011. We carried out engineering works – gravel piles and participated in the execution of earthworks. General Contractor – ZUM Muniserwis.

LOCATION:
Płock
BUILD DATE:
30-May-2011

Modernization of the National Road No. 8

Reconstruction of S8 to the parameters of an expressway – Start of implementation September 2009. Earthworks – excavation and embankments approx. 588,000m3 – contractor Astaldi Sp. A.

LOCATION:
Rawa Maz. – Piotrków Tryb.
BUILD DATE:
30-Jan-2011

Agata Meble in Płock

Agata Meble – furniture store in Płock – start of execution November 2009. Execution of excavation for the facility (approx. 30,000m3) embankment (approx. 15,000m3), soil reinforcement, technological roads, roads in asphalt pavement – Sikorskiego and Kutrzeby Streets – contractor KPBP BUDUS S.A.

LOCATION:
Płock
BUILD DATE:
20-Nov-2009

ZŁOTY RÓG in Płock

Construction of “Złoty Róg” – Start of implementation August 2009. Implementation of excavation, embankment and piling of CFA piles in a casing pipe, the Berliner wall was also constructed.

LOCATION:
Płock
BUILD DATE:
30-Aug-2009

ORLEN ARENA sports and entertainment hall in Plock

Sports and entertainment hall ORLEN ARENA in Plock – start of construction May 2009. Implementation of embankments, excavations. General contractor – Vectra S.A.

LOCATION:
Płock
BUILD DATE:
10-May-2009

Cleaning the bay, strengthening the waterfront – Włocławek

Preparation of the waterfront in the area of the Ro-Ro ramp in Włocławek – Start of implementation March 2008. Execution of an exit for oversized vehicles, construction of supports for unloading equipment and mooring and directional elements for barges, cleaning and dredging of the bay – 12,000m3, strengthening of the waterfront – 410mb. Contractor – Sling Sp. j.

LOCATION:
Włocławek
BUILD DATE:
05-Jul-2008

‘Mazovia’ shopping mall in Płock

Shopping mall Mazovia in Płock – start of execution November 2007. Execution of excavation for the object (approx. 98,000m3), soil reinforcement, technological roads – contractor VECTRA S.A.

LOCATION:
Płock Podolszyce
BUILD DATE:
20-Nov-2007

‘Mosty’ shopping mall in Płock

Start of implementation February 2008. Execution of the excavation for the facility (approx. 25,000m3) embankments, working platforms (approx. 20,000m3), soil reinforcement, technological roads – contractor Manhattan Development.

LOCATION:
Płock
BUILD DATE:
02-Nov-2007

‘Wisła’ shopping mall in Płock

Wisła shopping mall in Płock – start of execution March 2007. Execution of excavation for the object (approx. 60,000m3), embankments (approx. 16,500m3), soil reinforcement, technological roads – contractor KPBP BUDUS S.A.

LOCATION:
Płock
BUILD DATE:
11-Mar-2007

‘Kaufland’ in Płock

Kaufland in Płock – start of execution September 2003. Execution of excavation for the object (approx. 40,000m3), soil reinforcement, technological roads – contractor Z. Marciniak S.A.

LOCATION:
Płock
BUILD DATE:
05-Jun-2003

Lewandpol, Płock – Biedronka, Otolinska Street

Demolition of old warehouses located next to LEVIS Plock, preparation for earthworks for the construction of a facility for Lewandpol company – Biedronka store.

LOCATION:
Płock
BUILD DATE:
01-Jan-2003

Access to the new bridge in Płock

Access to the Bridge in Plock – start of construction May 2008. Earthworks – excavation 151,337m3 and embankments 127,994m3 – General Contractor – Budimex Dromex S.A.

LOCATION:
Płock
BUILD DATE:
01-Jan-2003

‘OBI’ in Płock

OBI in Plock – start of execution November 2001. Execution of excavation for the object (approx. 40,000m3), soil reinforcement, technological roads.

LOCATION:
Płock Podolszyce
BUILD DATE:
15-Oct-2001

‘ECHO’ shopping mall in Plock – NOMI, CARREFOUR

ECHO shopping mall in Plock (NOMI, CARREFOUR) – start of construction October 2001. Execution of excavations and embankments approx. 55,000m3. General Contractor Mostostal Warsaw.

LOCATION:
Płock
BUILD DATE:
15-Oct-2001

‘Auchan’, GO SPORT in Płock

Auchan in Płock – start of execution November 2000. Execution of excavation for the object (approx. 45,000m3), soil reinforcement, technological roads – contractor TRASKO INVEST Sp. z o.o.

LOCATION:
Płock Podolszyce
BUILD DATE:
05-Nov-2000