REFERENCES
Satisfaction of our clients and opinion on the implementation of earthworks, demolition, engineering and waste disposal can be checked by reviewing the references issued TRANS-KOP s.c.
Construction of temporary roads
ORDERING:
AARSLEFF sp z o.o.LOCATION:
PKN Orlen S.A. – Płock.START AND ENDING:
26-Mar-2021 – 14-Oct-2021Construction of a resistance structure to protect existing underground pipelines, along with land leveling.
ORDERING:
AARSLEFF sp z o.o.LOCATION:
PKN Orlen S.A. – PłockSTART AND ENDING:
11-Dec-2020 – 14-Oct-2021Site hardening for TEREX DEMAG AC 700 crane
ORDERING:
NAFTOREMONT NAFTOBUDOWA Grupa Polimex MostostalLOCATION:
PKN Orlen S.A.START AND ENDING:
10-Aug-2021 – 10-Oct-2021Design, supply and turnkey construction of a propylene glycol (1,2-mpg) production plant by conversion of 99.5% distilled glycerin, together with supporting facilities and additional infrastructure
ORDERING:
Konsorcjum firm Technik Polska Sp. z o.o. oraz Biproraf Sp. z o.o.LOCATION:
Orlen Południe S.A. – TrzebiniSTART AND ENDING:
12-Jun-2019 – 15-Jun-2020Earthworks, including soil replacement and road works
ORDERING:
Konsorcjum firm Technik Polska Sp. z o.o. oraz Biproraf Sp. z o.o.LOCATION:
Orlen Południe S.A. – TrzebiniSTART AND ENDING:
12-Jun-2019 – 11-Jun-2020Construction of a 32,000m3 storage tank for Class III petroleum products with associated infrastructure at the Fuel Depot No. 22 in Małaszewicze
ORDERING:
AGAT S.A.LOCATION:
MałaszewiczeSTART AND ENDING:
29-Feb-2020 – 29-Apr-2020Construction of a gas dehumidification system
ORDERING:
PGNiG Technologie S.A.LOCATION:
XXXXXXXXXXXSTART AND ENDING:
24-Apr-2019 – 16-Jun-2019Renovation of DN500 pipeline on a length of 175m between 34.830-35.005 in the city of Lwówek
ORDERING:
MARBUDLOCATION:
LwówekSTART AND ENDING:
01-Jun-2019 – 01-Jul-2019Dehumidification – Preparing the site for further construction work
ORDERING:
PGNiG Technologie S.A.LOCATION:
Mikanowo next to WłocławekSTART AND ENDING:
24-Apr-2019 – 16-Jun-2019Reconstruction of diesel tanks at the Compounding Department – Construction of 4 storage tanks with a capacity of 9600m3 each.
ORDERING:
ZRB “Grzelak”LOCATION:
XXXXXXXXXXXXXXXXXXXSTART AND ENDING:
06-Nov-2018 – 28-Feb-2019Collection, transportation and disposal of waste numbers: 170101,170504,170506,170904
ORDERING:
MUNISERWISLOCATION:
PłockSTART AND ENDING:
01-Jan-2018 – 31-Dec-2018Collection, transportation and disposal of waste code 17 06 04 – mineral wool waste.
ORDERING:
TERMOBUDLOCATION:
PłockSTART AND ENDING:
01-Jan-2018 – 31-Dec-2018Collection, transportation and disposal of mineral wool waste (17 06 04)
ORDERING:
GER-BUDLOCATION:
PłockSTART AND ENDING:
01-Jan-2018 – 31-Dec-2018Collection, transportation and disposal of waste
ORDERING:
PIECOBUDOWA-PŁOCKLOCATION:
PłockSTART AND ENDING:
02-Jan-2018 – 31-Dec-2018Modernization of access road to agricultural land
ORDERING:
Urząd Gminy Brudzeń DużyLOCATION:
Turza Mała, gmina Brudzeń DużySTART AND ENDING:
17-Sep-2018 – 25-Oct-2018Construction of a production, storage and assembly hall of CNH Industrial Poland in Plock
ORDERING:
MCKB Sp. z o.o.LOCATION:
PłockSTART AND ENDING:
01-Oct-2017 – 01-Sep-2018Renovation of DN500 pipeline on the length of 260mb between 40.170 and 40.430 in the city of Miłostowo
ORDERING:
MARBUDLOCATION:
MiłostowoSTART AND ENDING:
01-Jun-2018 – 01-Aug-2018Construction of the north-western route of the city of Płock on the section from the “Bielska” junction to the “Długa” junction
ORDERING:
PORR S.A.LOCATION:
PłockSTART AND ENDING:
07-Aug-2017 – 18-Apr-2018Płock ring road – 3rd section
ORDERING:
Porr S.A.LOCATION:
Ring Road of Płock – “Construction of the north-western route of the city of Płock on the section from the junction “Bielska” to the junction “Długa”START AND ENDING:
30-Apr-2015 – 30-Dec-2017Renovation of DN500 pipeline in Baranówko town on Western Section 23.765-23.980(215mb); 24.050-24.310(260mb), Western Division
ORDERING:
MARBUDLOCATION:
BaranówkoSTART AND ENDING:
01-Jun-2017 – 01-Jul-2017Construction at the power station site of internal roads made of concrete cubes on a cement-stabilized substructure and a layer of natural stone, as well as the construction of an exit from the public road made of asphalt concrete and the widening of the entrance to the power station.
ORDERING:
Zakład Wykonawstwa Sieci Elektrycznych “ZWSE” RzeszówLOCATION:
XXXXXXXXXXXSTART AND ENDING:
01-Aug-2015 – 31-Dec-2016Preparation of roads and loading yards for transportation of oversized components of the gas and steam power plant
ORDERING:
BEST LogisticsLOCATION:
PłockSTART AND ENDING:
01-Mar-2016 – 31-May-2016Renovation of the power grid
ORDERING:
ZEP-CWS Grupa EnergaLOCATION:
ŻabinySTART AND ENDING:
01-Sep-2014 – 31-Dec-2014Construction of a collision-free intersection between Pilsudski Avenue and the railroad line
ORDERING:
PBDILOCATION:
PłockSTART AND ENDING:
01-Oct-2013 – 10-Oct-2014Demolition and disposal of reinforced concrete structure associated with the decommissioning of OOG-320 boiler facilities No. K1
ORDERING:
Polimex MostostalLOCATION:
Płock, PKN OrlenSTART AND ENDING:
01-Jul-2014 – 31-Aug-2014Construction of a plant for catalytic denitrification and dedusting of flue gases from boilers of a thermal power plant
ORDERING:
Beton Stal OstrołękaLOCATION:
PKN Orlen S.A. PłockSTART AND ENDING:
01-Sep-2013 – 30-Sep-2013Demolition and disposal of the reinforced concrete structure associated with the decommissioning of the K6 boiler facilities at the thermal power plant site
ORDERING:
Polimex MostostalLOCATION:
PKN Orlen S.A. PłockSTART AND ENDING:
01-Aug-2013 – 31-Aug-2013Modernization of sewage treatment plant
ORDERING:
MARBUDLOCATION:
Maszewo DużeSTART AND ENDING:
01-Sep-2012 – 31-Jul-2013Construction of a process road for disposal of ash and slag from the landfill
ORDERING:
Beton Stal OstrołękaLOCATION:
ŁęgSTART AND ENDING:
01-Nov-2012 – 31-May-2013Modernization of National Road No. 8
ORDERING:
Astadi Sp A.LOCATION:
Rawa Maz. – Piotrków Tryb.START AND ENDING:
05-Sep-2010 – 06-Oct-2012Plock ul. Sikorskiego, Kutrzeby – parking lots, earthworks
ORDERING:
Agata Meble – Budus S.A.LOCATION:
Agata Meble furniture showroom in Plock – start of execution November 2009. Execution of excavation for the object (approx. 30,000m3) embankment (approx. 15,000m3), soil reinforcement, technological roads, roads in asphalt pavement – Sikorskiego and Kutrzeby Streets – contractor KPBP BUDUS S.A.START AND ENDING:
01-Feb-2010 – 10-Sep-2010Foundation piles, earthworks – ‘Złoty Róg’
ORDERING:
Vectra S.A.LOCATION:
Construction of “Złoty Róg” – Start of implementation August 2009. Implementation of excavation, embankment and piling with CFA piles in a casing pipe, a Berliner wall was also constructed.START AND ENDING:
01-Nov-2009 – 30-Jul-2010Waterfront, Ro-Ro ramp, oversized unloading
ORDERING:
Sling Sp. z o.o. – PKN ORLEN S.ALOCATION:
Preparation of the waterfront in the area of the Ro-Ro ramp in Wloclawek – Start of implementation March 2008. Construction of an exit for oversized vehicles, construction of supports for unloading equipment and mooring and directional elements for barges, cleaning and dredging of the bay – 12,000m3, strengthening of the waterfront – 410mb. Principal – Sling Sp. j.START AND ENDING:
01-Jul-2008 – 05-Apr-2009Earthworks – ‘Mazovia’
ORDERING:
Vectra S.A.LOCATION:
Shopping mall ‘Mazovia’ in Plock – start of execution November 2007. Execution of excavation for the object (approx. 98,000m3), soil reinforcement, technological roads – contractor VECTRA S.A;
START AND ENDING:
01-Apr-2008 – 05-Jul-2008Bridge access roads in Plock
ORDERING:
Budimex Dromex S.A.LOCATION:
Bridge access roads in Plock – start of construction May 2008. Earthworks – excavation 151,337m3 and embankments 127,994m3 – General Contractor – Budimex Dromex S.A.;START AND ENDING:
05-Apr-2006 – 31-Jul-2007Gigablok – Sewage treatment plant
ORDERING:
ILF Consulting Engineers i HB 6LOCATION:
Sewage treatment plant Katowice – Gigablok. Start of implementation 2004. Execution of excavations – 65,000m3, execution of embankments 85,000m3. General contractor Hydrobudowa-6 S.A.. Investor supervision – ILF Consulting Engineering.START AND ENDING:
15-Dec-2004 – 31-Jan-2006Kaufland – Płock
ORDERING:
ZB MarciniakLOCATION:
Kaufland in Plock – start of execution September 2003. Execution of excavation for the object (approx. 40,000m3), soil reinforcement, technological roads – commissioned by Z. Marciniak S.A.START AND ENDING:
01-Jun-2003 – 02-Sep-2003Auchan Płock – GO SPORT
ORDERING:
TRASKO, FIODOR P.P.H.U. S.jLOCATION:
Auchan in Plock – start of execution November 2000. Execution of excavation for the object (approx. 45,000m3), soil reinforcement, technological roads – contractor TRASKO INVEST Sp. z o.o.START AND ENDING:
01-Nov-2000 – 02-Mar-2001