Satisfaction of our clients and opinion on the implementation of earthworks, demolition, engineering and waste disposal can be checked by reviewing the references issued TRANS-KOP s.c.

Construction of temporary roads

ORDERING:
AARSLEFF sp z o.o.
LOCATION:
PKN Orlen S.A. – Płock.
START AND ENDING:
26-Mar-2021 – 14-Oct-2021

Construction of a resistance structure to protect existing underground pipelines, along with land leveling.

ORDERING:
AARSLEFF sp z o.o.
LOCATION:
PKN Orlen S.A. – Płock
START AND ENDING:
11-Dec-2020 – 14-Oct-2021

Site hardening for TEREX DEMAG AC 700 crane

ORDERING:
NAFTOREMONT NAFTOBUDOWA Grupa Polimex Mostostal
LOCATION:
PKN Orlen S.A.
START AND ENDING:
10-Aug-2021 – 10-Oct-2021

Design, supply and turnkey construction of a propylene glycol (1,2-mpg) production plant by conversion of 99.5% distilled glycerin, together with supporting facilities and additional infrastructure

ORDERING:
Konsorcjum firm Technik Polska Sp. z o.o. oraz Biproraf Sp. z o.o.
LOCATION:
Orlen Południe S.A. – Trzebini
START AND ENDING:
12-Jun-2019 – 15-Jun-2020

Earthworks, including soil replacement and road works

ORDERING:
Konsorcjum firm Technik Polska Sp. z o.o. oraz Biproraf Sp. z o.o.
LOCATION:
Orlen Południe S.A. – Trzebini
START AND ENDING:
12-Jun-2019 – 11-Jun-2020

Construction of a 32,000m3 storage tank for Class III petroleum products with associated infrastructure at the Fuel Depot No. 22 in Małaszewicze

ORDERING:
AGAT S.A.
LOCATION:
Małaszewicze
START AND ENDING:
29-Feb-2020 – 29-Apr-2020

Construction of a gas dehumidification system

ORDERING:
PGNiG Technologie S.A.
LOCATION:
XXXXXXXXXXX
START AND ENDING:
24-Apr-2019 – 16-Jun-2019

Renovation of DN500 pipeline on a length of 175m between 34.830-35.005 in the city of Lwówek

ORDERING:
MARBUD
LOCATION:
Lwówek
START AND ENDING:
01-Jun-2019 – 01-Jul-2019

Dehumidification – Preparing the site for further construction work

ORDERING:
PGNiG Technologie S.A.
LOCATION:
Mikanowo next to Włocławek
START AND ENDING:
24-Apr-2019 – 16-Jun-2019

Reconstruction of diesel tanks at the Compounding Department – Construction of 4 storage tanks with a capacity of 9600m3 each.

ORDERING:
ZRB “Grzelak”
LOCATION:
XXXXXXXXXXXXXXXXXXX
START AND ENDING:
06-Nov-2018 – 28-Feb-2019

Collection, transportation and disposal of waste numbers: 170101,170504,170506,170904

ORDERING:
MUNISERWIS
LOCATION:
Płock
START AND ENDING:
01-Jan-2018 – 31-Dec-2018

Collection, transportation and disposal of waste code 17 06 04 – mineral wool waste.

ORDERING:
TERMOBUD
LOCATION:
Płock
START AND ENDING:
01-Jan-2018 – 31-Dec-2018

Collection, transportation and disposal of mineral wool waste (17 06 04)

ORDERING:
GER-BUD
LOCATION:
Płock
START AND ENDING:
01-Jan-2018 – 31-Dec-2018

Collection, transportation and disposal of waste

ORDERING:
PIECOBUDOWA-PŁOCK
LOCATION:
Płock
START AND ENDING:
02-Jan-2018 – 31-Dec-2018

Modernization of access road to agricultural land

ORDERING:
Urząd Gminy Brudzeń Duży
LOCATION:
Turza Mała, gmina Brudzeń Duży
START AND ENDING:
17-Sep-2018 – 25-Oct-2018

Construction of a production, storage and assembly hall of CNH Industrial Poland in Plock

ORDERING:
MCKB Sp. z o.o.
LOCATION:
Płock
START AND ENDING:
01-Oct-2017 – 01-Sep-2018

Renovation of DN500 pipeline on the length of 260mb between 40.170 and 40.430 in the city of Miłostowo

ORDERING:
MARBUD
LOCATION:
Miłostowo
START AND ENDING:
01-Jun-2018 – 01-Aug-2018

Construction of the north-western route of the city of Płock on the section from the “Bielska” junction to the “Długa” junction

ORDERING:
PORR S.A.
LOCATION:
Płock
START AND ENDING:
07-Aug-2017 – 18-Apr-2018

Płock ring road – 3rd section

ORDERING:
Porr S.A.
LOCATION:
Ring Road of Płock – “Construction of the north-western route of the city of Płock on the section from the junction “Bielska” to the junction “Długa”
START AND ENDING:
30-Apr-2015 – 30-Dec-2017

Renovation of DN500 pipeline in Baranówko town on Western Section 23.765-23.980(215mb); 24.050-24.310(260mb), Western Division

ORDERING:
MARBUD
LOCATION:
Baranówko
START AND ENDING:
01-Jun-2017 – 01-Jul-2017

Construction at the power station site of internal roads made of concrete cubes on a cement-stabilized substructure and a layer of natural stone, as well as the construction of an exit from the public road made of asphalt concrete and the widening of the entrance to the power station.

ORDERING:
Zakład Wykonawstwa Sieci Elektrycznych “ZWSE” Rzeszów
LOCATION:
XXXXXXXXXXX
START AND ENDING:
01-Aug-2015 – 31-Dec-2016

Preparation of roads and loading yards for transportation of oversized components of the gas and steam power plant

ORDERING:
BEST Logistics
LOCATION:
Płock
START AND ENDING:
01-Mar-2016 – 31-May-2016

Renovation of the power grid

ORDERING:
ZEP-CWS Grupa Energa
LOCATION:
Żabiny
START AND ENDING:
01-Sep-2014 – 31-Dec-2014

Construction of a collision-free intersection between Pilsudski Avenue and the railroad line

ORDERING:
PBDI
LOCATION:
Płock
START AND ENDING:
01-Oct-2013 – 10-Oct-2014

Demolition and disposal of reinforced concrete structure associated with the decommissioning of OOG-320 boiler facilities No. K1

ORDERING:
Polimex Mostostal
LOCATION:
Płock, PKN Orlen
START AND ENDING:
01-Jul-2014 – 31-Aug-2014

Construction of a plant for catalytic denitrification and dedusting of flue gases from boilers of a thermal power plant

ORDERING:
Beton Stal Ostrołęka
LOCATION:
PKN Orlen S.A. Płock
START AND ENDING:
01-Sep-2013 – 30-Sep-2013

Demolition and disposal of the reinforced concrete structure associated with the decommissioning of the K6 boiler facilities at the thermal power plant site

ORDERING:
Polimex Mostostal
LOCATION:
PKN Orlen S.A. Płock
START AND ENDING:
01-Aug-2013 – 31-Aug-2013

Modernization of sewage treatment plant

ORDERING:
MARBUD
LOCATION:
Maszewo Duże
START AND ENDING:
01-Sep-2012 – 31-Jul-2013

Construction of a process road for disposal of ash and slag from the landfill

ORDERING:
Beton Stal Ostrołęka
LOCATION:
Łęg
START AND ENDING:
01-Nov-2012 – 31-May-2013

Modernization of National Road No. 8

ORDERING:
Astadi Sp A.
LOCATION:
Rawa Maz. – Piotrków Tryb.
START AND ENDING:
05-Sep-2010 – 06-Oct-2012

Plock ul. Sikorskiego, Kutrzeby – parking lots, earthworks

ORDERING:
Agata Meble – Budus S.A.
LOCATION:
Agata Meble furniture showroom in Plock – start of execution November 2009. Execution of excavation for the object (approx. 30,000m3) embankment (approx. 15,000m3), soil reinforcement, technological roads, roads in asphalt pavement – Sikorskiego and Kutrzeby Streets – contractor KPBP BUDUS S.A.
START AND ENDING:
01-Feb-2010 – 10-Sep-2010

Foundation piles, earthworks – ‘Złoty Róg’

ORDERING:
Vectra S.A.
LOCATION:
Construction of “Złoty Róg” – Start of implementation August 2009. Implementation of excavation, embankment and piling with CFA piles in a casing pipe, a Berliner wall was also constructed.
START AND ENDING:
01-Nov-2009 – 30-Jul-2010

Waterfront, Ro-Ro ramp, oversized unloading

ORDERING:
Sling Sp. z o.o. – PKN ORLEN S.A
LOCATION:
Preparation of the waterfront in the area of the Ro-Ro ramp in Wloclawek – Start of implementation March 2008. Construction of an exit for oversized vehicles, construction of supports for unloading equipment and mooring and directional elements for barges, cleaning and dredging of the bay – 12,000m3, strengthening of the waterfront – 410mb. Principal – Sling Sp. j.
START AND ENDING:
01-Jul-2008 – 05-Apr-2009

Earthworks – ‘Mazovia’

ORDERING:
Vectra S.A.
LOCATION:
Shopping mall ‘Mazovia’ in Plock – start of execution November 2007. Execution of excavation for the object (approx. 98,000m3), soil reinforcement, technological roads – contractor VECTRA S.A;

START AND ENDING:
01-Apr-2008 – 05-Jul-2008

Bridge access roads in Plock

ORDERING:
Budimex Dromex S.A.
LOCATION:
Bridge access roads in Plock – start of construction May 2008. Earthworks – excavation 151,337m3 and embankments 127,994m3 – General Contractor – Budimex Dromex S.A.;
START AND ENDING:
05-Apr-2006 – 31-Jul-2007

Gigablok – Sewage treatment plant

ORDERING:
ILF Consulting Engineers i HB 6
LOCATION:
Sewage treatment plant Katowice – Gigablok. Start of implementation 2004. Execution of excavations – 65,000m3, execution of embankments 85,000m3. General contractor Hydrobudowa-6 S.A.. Investor supervision – ILF Consulting Engineering.
START AND ENDING:
15-Dec-2004 – 31-Jan-2006

Kaufland – Płock

ORDERING:
ZB Marciniak
LOCATION:
Kaufland in Plock – start of execution September 2003. Execution of excavation for the object (approx. 40,000m3), soil reinforcement, technological roads – commissioned by Z. Marciniak S.A.
START AND ENDING:
01-Jun-2003 – 02-Sep-2003

Auchan Płock – GO SPORT

ORDERING:
TRASKO, FIODOR P.P.H.U. S.j
LOCATION:
Auchan in Plock – start of execution November 2000. Execution of excavation for the object (approx. 45,000m3), soil reinforcement, technological roads – contractor TRASKO INVEST Sp. z o.o.
START AND ENDING:
01-Nov-2000 – 02-Mar-2001